ryan@teamredpoint.com

913.871.6900

  • Design • Domestic • Engineering • Project Management

    Wastewater Storage Tank

    Completion:  December 2015 Project Description: Alternative generation and capture are growing components in the industrial...

  • Design • Domestic • Engineering • Installation • Project Management • Supply

    Silo Drive Through Enclosure

    Completion:  August 2015 Project Description: Oftentimes, storage silos include a truck drive through arrangement.  This allows...

  • Construction • Design • Domestic • Engineering • Installation • Project Management • Supply

    Railcar Awning

    Completion:  November 2014 Project Description: Controlling moisture in sand storage and handling systems is critical to...

  • Domestic • Engineering • Installation • Project Management

    Frac Sand Transload Terminal

    Completion: October 2011 Project Description: The expanding fraccing industry has demanded that wells have the ability to obtain...

  • Design • Domestic • Engineering • Installation • Project Management • Supply

    Truck Unload Building

    Completion:  August 2014 Project Description: Frac sand facilities are scattered throughout south Texas, both new and old. ...

  • Domestic • Engineering • Project Management

    Dry Ash Storage

    Completion:  June 2015 Project Description: Municipalities have a variety of specifications and requirements that require due...

  • Domestic • Engineering • Project Management

    Activated Carbon Storage Silos

    Completion:  June 2015 Project Description: Coordination of equipment and components has always been a strong point of...

  • Design • Domestic • Engineering • Project Management

    Fly Ash Storage Silo

    Completion:  April 2015 Project Description: Today, nearly 1/3 of the energy created in the United States is derived from coal...

  • Design • Domestic • Engineering • Project Management • Supply

    Dry Sorbent Injection Storage Silos

    Completion:  February 2015 Description of project: Redpoint led the project management and engineering efforts for a three silo...

  • Design • Engineering • Installation • International • Project Management • Supply

    Frac Sand Transload Terminal

    Completion:  October 2014 Project Description: This state of the art facility boasts significant storage capacity with (6)...